Case No 681/94 IN THE SUPREME COURT OF SOUTH AFRICA (APPELLATE DIVISION)
In the matter between:
THE MINISTER OF PUBLIC WORKS AND
LAND AFFAIRS Appellant
and
GROUP FIVE BUILDING LIMITED Respondent
CORAM: E M GROSSKOPF,EKSTEEN, HARMS, OLIVIER, JJA etZULMAN,AJA
HEARD: 22 AUGUST 1996
DELIVERD: 17 SEPTEMBER 1996
JUDGMENT E M GROSSKOPF. JA
2 This appeal concerns the interpretation of a building contract between
the parties for the erection by the respondent of the archive building in
Cape Town on the site of the old Roeland Street gaol. As is usual the
contract consists of a number of documents including the Conditions of
Contract, the Bills of Quantities and the Drawings. In terms of clause 6 (1)
of the Conditions of Contract,
"[all] material and work shall be as described on the Drawings and in the .... Bills of Quantities."
The dispute arises from one item in the Bills of Quantities, relating
to the roofing of the building. Under the heading "Dakbedekkings" the Bills
of Quantities prescribe the use of "'Cordova' of ander goedgekeurde groen
geglasuurde klei dakteëls ... soos vervaardig deur 'Corobrick (Edms) Bpk.'"
Then follows the disputed provision, viz., item 157A. It reads as follows,
with the critical words underlined:
3
"Klei dakteëls tot plat helling op dakhoutwerk gelê, en bevestig soos beskryf alles streng ooreenkomstig die vervaardiger se voorskrifte".
An area of 4312 square metres is specified for this item. The Bills of
Quantities do not indicate how many tiles would be required to cover this
area. The number of tiles could be determined from the area given, the size
of the tiles and the extent of their overlap. The sole information regarding
the size of the tiles and their overlap was to be found in the "vervaardiger
se voorskrifte" mentioned in the Item. These "voorskrifte", it was common
cause, were embodied in a brochure issued by Corobrik. According to this
brochure the size of the Cordova tiles was 406 by 203 mm. However, two
ways of fixing the tiles were set out in the brochure. The one (described as
method A) was for tiles laid under normal conditions. Here a 102 mm
headlap was considered adequate. The second (method B) was for tiles "laid
on a very low pitched roof and where extreme windy conditions prevail".
4 Here a headlap of 203 mm was suggested. By requiring a greater overlap,
method B would use more tiles than method A in covering the same area.
This forms the crux of the dispute between the parties. The respondent sued
in the Cape Provincial Division for an order declaring that method A was
prescribed by the contract. The appellant opposed the claim, and
counterclaimed for an order declaring that method B was the chosen one.
The court a quo (Van Niekerk J) held in favour of the respondent. With
leave granted pursuant to a petition to the Chief Justice the appellant now
appeals against this judgment.
Strictly speaking the brochure does not contain any "voorskrifte"
(directions or instructions). It is more in the nature of an informative
document, giving details of the product and suggesting how it is to be used
in particular circumstances. Its contemplation clearly is that the person
5 using the tiles would have to decide which of the suggested methods would
be appropriate. In the present case it was the architect's duty to stipulate
how the tiles were to be laid. Save for the reference to the manufacturer's
instructions, item 157A of the Bills of Quantities does not reflect any
stipulation as to the overlap required by the contract. I shall consider later
whether any of the other contractual provisions casts light on this matter.
The respondent's argument, which was accepted by the court a quo, was essentially that the court should look no further than item 157A read with the brochure, and that this limited perspective provides an answer to the problem. This argument was developed as follows.
Clause B1.6 of the Bills of Quantities provides;
"Hierdie Hoeveelheidslyste is opgestel ooreenkomstig die jongste Standaardstelsel vir die Opname van Bouerswerk uitgereik deur die Vereniging van Suid-Afrikaanse Bourekenaars. Waar van hierdie stelsel afgewyk is, sal dit duidelik aangedui wees en voorrang
6 geniet."
The Standard System of Measuring Builders' Work, to which
reference is made in the above clause, and to which I shall refer as the
Standard System, provides inter alia as follows:
"3 Scope of bills of quantities
The bills of quantities shall set out all the work to be done in sufficient detail to give a clear idea of the character and cost. Everything of consequence in respect of costs, shown on the drawings or described in the specifications, shall be embodied and nothing shall be left to assumption. The bills of quantities shall be as simple as possible provided that they fully describe the materials and workmanship and accurately represent the work to be executed.
4 Descriptions
Descriptions shall be clear and complete, leaving no reasonable doubt
as to their intent and meaning and containing all the essential
information necessary for pricing
5 Separation of items
Items shall be separated in accordance with the detailed instructions laid down in the various trades, based on the following rules:
a) The recognised and customary trades shall be separated and a combination of such trades in the same item shall be avoided ...."
7 Item 157A of the Bills of Quantities falls within the section dealing
with roofing. By reason of the above provisions of the Standard System a
tenderer is entitled to assume, so it is contended, that every provision
relating to roofing is contained clearly and unambiguously in that section.
He could accordingly not be expected to have regard to any other part of
the contract to determine what the roofing requirements are. And, for
present purposes, the only relevant part of the roofing section is contained
in Item 157A read with the brochure. If the enquiry is limited to these
provisions, the argument concluded, the only reasonable inference is that
method A was prescribed, since it is the normal method to be employed -
if the exceptional method B was intended, the person drawing the Bills of
Quantities would, pursuant to the Standard System, have expressly so
provided.
8 This argument rests heavily on the Standard System, and there was
some debate before us as to its legal effect. The parties specifically
incorporated it in their contract and must, in my view, have intended that
the Bills of Quantities should be read in the light of the Standard System.
It is difficult to generalise on how such an approach would affect the
process of interpretation. One thing is clear, however. If an item in Bills of
Quantities is ambiguous the Standard System cannot render it unambiguous.
In such a case one can only infer that the quantity surveyor who drew the
Bills did not achieve the high standards prescribed by the Standard System.
And the ambiguity would, in my view, have to be resolved by applying
ordinary contractual principles.
I turn now to the interpretation of item 157A read with the brochure.
As already stated, the brochure suggests two alternative methods of fixing
9
the tiles. The one is said to be appropriate "under normal conditions". The
other is suggested for "a very low pitched roof and where extreme windy conditions prevail". Does this mean, as the respondent contended, that, in the absence of any indication to the contrary, the normal method, i e method A, should be employed? In my view this does not follow. Item 157A itself mentions that the tiles are to be fixed on a "plat helling". The evidence discloses that this expression served only to indicate to a tenderer that work on the roof would not be rendered difficult by a steep pitch, and I accept that it casts no real light on which method would be appropriate. Nevertheless, putting it at its lowest, there is no indication in the Item that the roof is anything other than "a very low pitched roof. And it was common cause on the evidence that Roeland Street, Cape Town, may well be considered a locality "where extreme windy conditions prevail". What
10 reason therefore is there to assume, by looking only at the Item and the
brochure, that the architect who drew the plans and the quantity surveyor
who drew the Bills intended method A to be employed rather than method
B?
The appellant's contention is that this ambiguity may be resolved by
having regard to other provisions of the contract. In this regard it is
important to note that the method of fixing the tiles influences other aspects
of the building work, and in particular the carpentry. The tiles are fixed to
wooden battens, and the distance between the battens depends on the
method to be used in laying the tiles. Thus the brochure stipulates that, for
method A, the battens are generally to be spaced at 305 mm centres,
whereas for method B the spacing was to be, generally, at 203 mm centres.
The section of the Bills of Quantities dealing with the trade of carpenters
11
and joiners lays down that the battens are to be spaced at 203 mm, which is a clear indication that method B is to be applied. But, the respondent argues, by reason of the Standard System, the item dealing with work to be performed by the roofer must be read by itself and not in conjunction with items relating to other "recognised and customary trades" (clause 5 of the Standard System) such as carpenters and joiners. It is not necessary to deal with this argument for reasons which follow.
In the introduction to the Bills of Quantities the tenderer is informed that the building plans issued together with the tender documents do not comprise a complete set "maar dien slegs om 'n gids vir tenderdoeleindes te wees, om die omvang van die werk aan te dui en om die Tenderaar in staat te stel om bekend te raak met die aard en omvang van die Werke en die wyse waarop dit uitgevoer word." Quite clearly these plans are intended
12
to be read together with the Bills of Quantities. See also the specific
reference to "the Drawings" in clause 6(1) of the conditions of Contract, quoted above. I cannot imagine that a roofing specialist or other tenderer would make a tender before ascertaining from the plans exactly how the roof is to be constructed. Among these drawings (which, it must be emphasized, form a part of the contract) is one showing a section of the building and another which is described as a "dakplan". Both these plans contain a description of the method to be employed in fixing the tiles. This description corresponds closely with Item 157A, except that it stipulates also that the tiles are to be fixed on battens at 203 mm centres. This is the distance prescribed for Method B. In fact it would be physically impossible to apply Method A where battens are spaced in this way.
The respondent's counsel brushed aside the references to the batten
13
spaces in the drawings and in other items of the Bills of Quantities as
merely pointing to a discrepancy between item 157A and the information contained in these documents. Such a discrepancy, it was contended, was provided for in the contractual documents. Clause 6(2) of the Conditions of Contract lays down that, if a contractor were to detect a difference or discrepancy between or in the drawings, specification and/or bills of quantities, it shall be his duty to seek in writing a decision of the owner's representative on the true intent and meaning of the contract. I do not think this provision is really relevant. Obviously an apparent difference or discrepancy in the documents must be resolved in some way, and the contract makes provision for this. It is common cause, however, that all attempts to resolve the dispute between the parties have failed and that, pursuant to clause 27(2) of the Conditions of Contract, the matter has been
14 placed before the courts. We now have to interpret the contract. In
accordance with ordinary principles of interpretation, a court will, where
possible, interpret a contract so as to avoid discrepancies. This can be done
in the present case by reading the ambiguous provisions of item 157A and
the brochure with the descriptions set out on the drawings. If this is done,
it seems clear that the contract between the parties required method B to be
applied.
In the result the appeal succeeds with costs including the costs of two counsel. The order of the court a quo is set aside and the following substituted:
1. An order is made declaring that on a proper construction of item 157A of "Lys no 8" of the Bills of Quantities, being part of Contract no. 860109, the applicable method of fixing roof
15
tiles was that described as the "B" method of fixing tiles for a
203 mm headlap in annexure PPC3 to the plaintiffs particulars of claim.
-
Claim A of the plaintiffs particulars of claim is dismissed.
-
The plaintiff is ordered to pay the costs of this action, which are to include the costs of two counsel.
E M GROSSKOPF, JA
EKSTEEN, JA
HARMS, JA OLIVIER, JA
ZULMAN, AJA Concur